Client: Waste Management Company

Location: Banbury, Oxfordshire

Installed: Work Place Charger 

Number of points installed: 1

Situation

Our client already had 1 outside twin ROLEC pedestal installed on site which had no connectivity. As an OZEV registered installer we recommended to design and replace the out of date sockets with a ROLEC pedestal unit with a ROLEC 7.2KW dual pedestal complete with back office (OCPP).

The aim of this project was to bring up to date all the functionality and back-office management requirements across all sites and also provide a future charge point solution for their growing number of employees with electric vehicles.

Task

In May 2021, VOLT CPI designed, supplied and installed 1 x 7.2KW dual pedestal. We advised the client to update the electrical infrastructure and groundworks required.

Results

The current installation is working exactly as required and we are adding to the scheme and back office with a further 2 points due to be installed at Banbury in July 2021, with a view to continue to roll out a programme of updating existing units and new installs combined with our maintenance and call out capacity.

Testimonial

“VOLT CPI have supplied and installed exactly what the business required with the added benefit of updated products and a manageable back office solution. This will mean we now have a future proof solution for our business requirements. Oakley TFM And VOLT CPI have provided a fully accredited installation, offering the OZEV grant saving us time and money combined with a professional level of experience with excellent technical knowledge and ongoing support . We are also able to call on Oakley TFM VOLT CPI to manage and maintain our charge point network”